Customization: | Available |
---|---|
After-sales Service: | Guide Equipment Installation and Use |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This powder coating production line is used for the coating of auto parts.
The whole production line includes elevator auxiliary loading, pre-spray treatment (pre-degreasing, degreasing, washing, vitrification, washing...) water blowing, drying, cooling, powder coating (wearing constant temperature and humidity system), curing, forced cooling , manual picking and other functional parts.
This production line uses stainless steel powder spraying booth and PVC powder spraying booth, and the workpiece materials to be processed are aluminum alloy and steel plate. The spraying method combines automatic spraying and additional manual coating.
The Process of Powder Coating Line:
1. Surface Preparation: | The first step in the powder coating line is the surface preparation of the aluminum profiles. This stage is essential to ensure proper adhesion of the powder coating. Surface preparation may include cleaning, degreasing, and removing any contaminants from the aluminum surfaces. |
2. Pre-Treatment: | After surface preparation, the aluminum profiles undergo a pre-treatment process to enhance coating adhesion and corrosion resistance. Common pre-treatment methods include chemical cleaning, phosphating, or chromate conversion coating. The pre-treatment prepares the aluminum surface for better powder adhesion and improves coating performance. |
3. Drying: | Once the pre-treatment is completed, the aluminum profiles are passed through drying ovens to remove any remaining moisture from the surface. Dry aluminum surfaces are crucial for proper powder coating adhesion and finish. |
4. Powder Coating Application: | The dried aluminum profiles are then ready for powder coating application. The powder coating material is electrostatically charged and sprayed onto the aluminum profiles using powder coating guns. The positively charged powder particles are attracted to the grounded aluminum profiles, adhering to the surface uniformly. |
5. Powder Curing: | After powder coating application, the aluminum profiles are transferred to curing ovens. In the curing ovens, the powder coating undergoes a thermal curing process. The oven's heat causes the powder particles to melt and flow, creating a continuous, smooth coating film. The curing process also chemically cross-links the powder particles, ensuring a durable and hardened finish. |
6. Cooling: | Following the curing process, the coated aluminum profiles are allowed to cool down. This cooling phase stabilizes the coating and ensures it maintains its properties and appearance. |
7. Quality Inspection: | After cooling, the coated aluminum profiles undergo a thorough quality inspection. The inspection involves checking the coating thickness, appearance, adhesion, and overall quality to ensure it meets the specified standards. |
We are responsible for training the user operators and equipment maintenance personnel, and the training period is 3 working days.
During the warranty period, the supplier provides equipment accessories free of charge (except for failures caused by vulnerable, consumable parts, user factors and force majeure). After the warranty period, we continue to provide services for a fee.